Step One of Installing the WaterGuard
Step one of Installing the WaterGuard Drainage System is to dig a trench around the perimeter allowing the drainage channel to fit discreetly under the floor but on top of the foundation footing
Step 2 of WaterGuard Installation
The next step in the WaterGuard installation process is to place the channel in the trench that was dug and then backfill the trench with rocks/gravel to help filter out and prevent debris from entering.
Final Step in WaterGuard Installation
The final step in installing the WaterGuard Drainage System is to cover the entire trench with a fresh layer of concrete that is level with the floor. This works exceptionally well because it allows the system to remain below the floor level but still remain above the foundation footing. For this family it was the perfect solution to solve their basement waterproofing problems